CASE STUDIES
PSI Tampa has completed thousands of installation and mitigation designs. The goal is each is “0” damage from that point on and our record is as good as it gets, unblemished. If our name is on the project, part of the installation process is for PSI Tamp to inspect the installation and approve it.
Florida Credit Union Data Center Shrugs off Direct Lightning Hit
Old Walmart + Electrical Upgrade = New 9-1-1 Center
Copper-based Grounding System Ends Lightning Damage at Florida Resort
Florida 911 Center Upgrades Lightning Protection System for Maximum Safety
Orange County’s 911 System Ends Million Dollar Losses From Lightning Damage
Reliable Grounding Saves Years of Seed Development, Protects Equipment
Finding the Path of Least Resistance for WRZN Radio
Upgraded Grounding and Bonding Systems
Prevent Costly Disasters for Florida Radio Group
Lightning Strikes Twice: Proper Grounding Prevents Outages
Power Quality – Case Studies (organized by topic)